Abcott Construction is pleased to be working with the Global Citrus Group on their new rear addition to the existing facility located in Brantford, ON. The 32,375 sf Pre-Engineered building addition, as supplied by Butler Buildings, will include 20,800 sf of racked cooler storage with an interior clear height of 32’-0”, Eight (8) additional loading docks and dry storage areas all to assist Global Citrus in their growing tropical fruit distribution business by consolidating numerous facilities efficiently into one. The site development also includes a unique stormwater storage & distribution system from Permavoid Drainage Systems, treating stormwater as a resource rather than a waste product. This Design/Build project is scheduled to be complete in the Spring of 2022.
NEXT PROJECTTake a look at some of our other projects by selecting a category below.